国产精品福利电影-国产精品福利电影一-国产精品福利短视在线播放-国产精品福利短视在线播放频-国产精品福利久久-国产精品福利久久2025

ChineseEnglish Hotline:0571-86062609
Industry information current location:Home  > News > Industry information
Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: 国产精品日本不卡一区二区 | 男女啪啪永久免费观看网站 | 日韩乱码人妻无码中文字幕视 | 久久精品99久久香蕉国产 | 亚洲视频一区 | 亚洲欧美人成网站综合在线 | 亚洲国产成人不卡在线播放 | 精品国产Aⅴ无码久久久社区 | 日韩欧美一卡2卡3卡4卡无卡免费 | 熟妇高潮喷沈阳45熟妇高潮喷 | 国产内射爽爽大片 | 国产精品国产对白熟妇 | 免费高清在线观看a网站 | 91制服丝袜在线 | 国产精品久久久久久搜索 | 日韩欧美视频一区 | 亚洲国产综合精品第一 | 午夜福利视频集合100092 | 免费人妻精品一区二区三区 | 午夜婷婷精品午夜无码A片影院 | 国产真实尾随入室迷晕丝袜美女 | 欧美五级在线观看视频播放 | 国产免费av片在线观看不卡 | 国产一区二区三区不卡在线观看 | 日韩不卡在线视频 | 欧美日韩国产在线观看88888 | 亚洲男人的天堂在线aⅴ视频 | 日韩欧美自拍中文字幕 | 亚洲无精品一区二区在线观看 | 国产人A片20252025久久 | 欧美日高清视频一区二区三区 | 日本精品少妇一区二区三区 | 少妇性夜夜春夜夜爽a片 | 中国鲜肉gay高中xx禁18网 | 免费的很黄很污的全部视频 | 亚洲精品无码永久在线观看你懂的 | 久久婷婷五月综合色国产香蕉 | 7777久久亚洲中文字幕 | 自拍视频国产三级 | 国产久青青青青在线观看 | 国产第一页屁屁影院 |